Joined
·
5,650 Posts
Started on this project earlier this year. Was paying some buds to work on it. They didnt have the time to show up so I ended up just finishing it myself. I gutted the room to the studs. Was gonna pay them for installing all the new stuff. Ended up taking back over after the sheetrock was hung.
My first tile job turned out great in my book. It took me awhile but I wanted it done right.
After I had gutted it to the studs and before I cut the shower out.
My first detailed tile job
My first tile job turned out great in my book. It took me awhile but I wanted it done right.
After I had gutted it to the studs and before I cut the shower out.



My first detailed tile job
